草在线视频免费看_日韩激情久久久久久久_岛国网站在线观看_竹菊AV一区二区三区四区_日本欧美亚洲日本_香蕉视频久久人人操在线_国产成人a人亚洲v品无码_最新中文字幕av

86-15237383444
EXPLAIN

Installation Requirements And Standards For 1515 Loom Foot Thread

Release:hnfzpj Click:11380

The installation requirements and standards for the foundation wire of the 1515 weaving machine are the same as those of the 1511 type and GA615. We analyze the dimensions of the foundation wire at various levels through pictures, provide detailed installation instructions for the foundation wire, and also carefully describe the inspection methods after the foundation wire is installed. We are willing to learn and exchange ideas with colleagues in Guangzhou Textile.

A32 foundation screw for 1515 Shuttle Loom

The foot wire of the weaving machine is divided into two specifications.1515 Power Loom Foot screws, Loom Foot Screws, Loom Installation,The A32 in the above picture is a short foot wire used for the foot installation of the I54 weaving machine's fuse box support. The following picture shows the anchor wire A27 we used to fix the weaving machine wall panel:

Size of anchor bolts and anchor wires for weaving machines

The A27 bottom bolt of the weaving machine, also known as the anchor wire, can be used for various models of shuttle looms and rapier looms. The specific installation requirements and standards are: the anchor pit is in the shape of a circular cone, the side section is trapezoidal (as shown in the figure below), the screw of the anchor wire is based on a diameter of 12 millimeters, and the length of the anchor wire protruding from the ground is recommended to be 55-60 millimeters. The burial depth underground shall not be less than 150 millimeters. After burying the anchor wire, its verticality shall be checked, and the angle ruler shall be used to check if it is less than 1 millimeter. The difference in center distance between the four anchor wires shall also be controlled within 1mm.

Installation of foundation wire for 1515 Loom

In order to reduce the vibration of the 1515 machine during operation, prevent the wall panel foot from breaking, and ensure the smooth operation of the whole machine, the floor board needs to be in full contact with the wall panel foot, and the nut of the foot wire also needs to be locked. After adjusting the pedal shaft and tightening the foot screws, use a 0.2mm micrometer to insert and test around the upper and lower sides of the foot board (the upper plane of the floor board). The insertion depth should be less than 6mm, and the width should be less than 13mm on the top and 25mm on the bottom. Please use this standard for judgment. If it does not meet this industry standard, the floor board needs to be corrected again. Please refer to the previous chapter for details on the steps.

FriendLink: BaiDu  Ecer  Xinda Textile  Ec21  Ecplaza  Chinatexnet  
Copyright © 2016 Xinxiang City Xinda Textile Machinery Parts Co. Ltd 【MANAGE】
ADDRESS:5F West, Unit 53A, Zone A, Huicheng Port Bay, Huixian City, Henan Province,China CONTACT:Mr Yang MOBILE:86-15237383444
TEL:+86-0373-6235050 FAX:+86-0373-6235050 E-MAIL:309816745@qq.com
WEB:http://m.goqx.cn
SERVICE
TEL:0373-6235050
主站蜘蛛池模板: 综合激情社区三级片一区二区| 婷婷九月免费在线视频| 久久97人爱无吗黄色片| 在线免费人妻αV电影| a片网站在线播放| 亚洲偷拍中文字幕| 黄色国产AV草久精品| 国产精品国内自产拍| 亚洲永久无码动漫一区| 极品销魂无码视频在线| 人人爱人人艹亚洲av艹| 亚洲视频流出超碰91人人妻| 日韩中文字幕资源视频| 精品一区二区三区99| 欧美插免费视频一级人妻网 | 免费观看毛片网站| 亚洲无码黄片在线看| 日韩在线综合美女欧洲亚洲精| 无码四季影视好视频乱伦| 欧美特级皇片28厘米长| 无码高清性爱视频| 亚州AAAA级特黄电影| 免费黄色A片小视频| 日本久久五月天国模吧av| 国产日产精品一区二区三区的介绍| 人人操人人操人人操妻| 亚洲精品1区2区| 国产一级真人片| 区欧美A片久久久性爱| AV国产无码黄网站91| 手机在线成人艹b网| 免费国产色情视频| 亚洲图片欧美色图激情小说 | 最新在线潮吹无码av| 亚洲r级电影在线| 超碰人人摸人人爽| 日韩AⅤ有码牛牛视频九九热| av在一起大香蕉| 无码免费看视频特级色视频| 国产一级簧片久久成人性/| 亚洲人妻系列黄色毛片性爱|