草在线视频免费看_日韩激情久久久久久久_岛国网站在线观看_竹菊AV一区二区三区四区_日本欧美亚洲日本_香蕉视频久久人人操在线_国产成人a人亚洲v品无码_最新中文字幕av

86-15237383444
EXPLAIN

Description And Aufbau Principle Of G263 Series Disc Loom

Release:hnfzpj Click:19334

This article focuses on the description and Aufbau principle of G263 series disc Loom. We use drawings such as the principle of bobbin changing and picking to give a detailed and comprehensive introduction to the automatic bobbin changing structure, so that the textile industry can be fully familiar with the description of Loom, the principle of Loom, the parameters of Loom, and the principle of disc looms, and meet the requirements of improving the innovative production and maintenance technology of Loom and updating the equipment of Loom in China.

Description of the process of automatic filament changing on the Loom

Introduction:

G263 (Z) disc loom is a cotton loom suitable for weaving pure cotton and blended cotton yarn. It is suitable for weaving fabrics with a weft density of 40-80 pieces/inch. There are mainly three types of loom door widths: G263-1250mm, G263Z-1350mm, and G263Z-1500mm. The machine speed is 185-200r/min, and the warp disc adopts φ 550mm or φ 600mm, equipped with the same motor as the 1511 and 1515 models -0.8KW.

(1) Shuttle size: 390mmX48mm X35mm (total shuttle length X shuttle bottom width X shuttle wall height)

(2) Size of weft tube with iron hoop: 190mm long, outer diameter of weft tube hoop 27mm

(3) Reed size: 1302mm long X 120mm high, 1404mmX120mm, 1578mm X120mm (calculated according to the door width of the Loom).

Hand drawn drawings of G263 automatic filament changing loom

When the G263 disc Loom works normally, it operates smoothly, the three spindles rotate flexibly, the axial clearance is less than 0.4mm, the crankshaft gear and the pedal shaft gear are well matched, and the tooth side clearance is less than 1.5mm. When the clutch starts working, the fully opened shuttle opening should be clear, and there should be no abnormal clamping phenomenon when the shuttle enters and exits the shuttle track.

(1) The reed seat of the disc loom is located at the lower warp surface of the rear center shed, which is about 1mm away from the plane of the shuttle board or flat, and cannot cause friction with the shuttle board. When the reed seat is in the rear center, a gap of 15-20mm should be maintained between the front heald frame and the reed cap.

(2) The surface of the tread plate has good contact with the surface of the tread rotor, and the parallelism of the contact surface is 0.2mm.

(3) The surface contact between the shuttle rotor and the shuttle nose is good, with a parallelism of 0.1mm on the contact surface. The angle between the shuttle box bottom plate, the shuttle box back plate, and the shuttle box front plate is 86.5 °.

(4) Shuttle box width: the inner side is the width of the shuttle+3mm, and the outer side is the width of the shuttle+1.6mm; Shuttle box height: The inner side is the shuttle height+4mm, and the outer side is the shuttle height+2mm.

(5) The shuttle surface at the junction of the shuttle box bottom plate and the shuttle board must be flush, with a horizontal shuttle board arc (concave) of 1.5mm and a steel reed (convex) of 1.5mm.

(6) The relative displacement of the coiling hook is three teeth and a half, the gap between the side support box and the steel reed is 1.6mm, and the distance between the side support cover edge and the shuttle plate surface is 22mm (G263) and 32mm (G263Z).

The Principle of Automatic Shuttle Changing Loom Picking

Technical requirements for fiber exchange system:

(1) The ratchet sleeve rotates flexibly, and the three pawls have good contact with the ratchet. When the handle is pulled and released again, the ratchet can rotate one tooth on its own.

(2) The positions of the disc, keyboard, and yarn guide are aligned with each other, and the guide iron plane is flush with or retracted by 0.5mm from the concave surface of the disc

(3) The gap between the curved surface of the replacement hammer and the pipe clamp: 3mm when lifting up and 1mm when pressing down.

Process Diagram of Fiber Replacement on G263Z Disc Loom

The above is the description of the G263 Loom and the principle of the G263Z Loom. The attached picture is the Aufbau principle diagram of the disc Loom. The different design methods of the disc Loom are complementary to the types of fabric changing and shuttle changing looms, which are based on reducing the failure rate and improving the production efficiency.

FriendLink: BaiDu  Ecer  Xinda Textile  Ec21  Ecplaza  Chinatexnet  
Copyright © 2016 Xinxiang City Xinda Textile Machinery Parts Co. Ltd 【MANAGE】
ADDRESS:5F West, Unit 53A, Zone A, Huicheng Port Bay, Huixian City, Henan Province,China CONTACT:Mr Yang MOBILE:86-15237383444
TEL:+86-0373-6235050 FAX:+86-0373-6235050 E-MAIL:309816745@qq.com
WEB:http://m.goqx.cn
SERVICE
TEL:0373-6235050
主站蜘蛛池模板: 亚洲人妻电影无码伊人婷婷| 欧美日韩加勒比一区二区| 欧美日韩乱伦小说网站| 人人爱人人操人人爱人人操| 人人j插人人国产A级一级片| 91久久人澡人人添人人爽欧美| 成人小说图片视频| A级片无码视频在线播放| 乱伦婷婷五月天日韩福利网| 亚洲无码毛片电影| 欧美一级无毛在线观看| 久久久久久AV无码免费网站动漫| 3级片久久久AV在线免| 二级黄色毛片成人在线无码| 国产玖玖在线观看| 中国av一区国产伊人自拍| 日本特黄一级视频| 91爱爱免费观看| 麻豆网站在线观看| 激情乱伦五月天AV新在线| 97婷婷五月天就去色| 青青av免费超碰97漂亮| 国产综合无码在线| 少妇在线视频老司机日韩不卡| 国产成人网站视频国产二区 | 破解版av在线a亚洲日本| 无码A级毛片国产激情久久| 一级特黄大片中国| 97这里只有精品| 欧美日韩一级特大黄片在线免费观看| 国产黄色一级大片| 国产精品无码精品er久久| 黄片免费视频在线播放| 黄色大片三级成人黄色网| 国产无码影片成人射精视频| 美女在线播放特黄色| 日韩成人免费AV影院| 老司机福利在线观看| 亚洲国产日韩无码| 99区免费观看特级生活片黄片| 国产特级大逼片69日韩|